Lagos adopts shipping containers in modular building designs for schools

The Lagos State Government has introduced modular building systems such as containerised material in its public schools, which will serve as a faster way of delivering classroom infrastructure.

The modular school system is an initiative, which involves creating technology-enabled schools from the scratch using containerised structures that have all the equipment needed for learning in the 21st century.

Modular classrooms/buildings are fitted with interactive information technology needed for learning, delivers safe, comfortable and eco-friendly structures. The system utilises environment-friendly materials for flooring, roofing, walls and paints.

the delivery of school buildings through modular system could take up to six months or less, offers flexibility for future up-grading, easy procurement process. The structure comes in form of a storey building with the ground floor and first floor and could also consist, ground, first and second floors.

Currently, the modular school building, consisting of shipping containers is being deployed at Vetland Junior Grammar School located in Agege.

The Chairman of the Special Committee on Rehabilitation of Public School (SCRPS), in Lagos, Mr. Hakeem Smith told The Guardian that the modular school system is planned for the state’s six educational districts.

He said, “The modular school is not like the conventional schools. What I mean is the brick and mortar school buildings, which are cement, block and concrete. We have seen the urgency and the need to quickly improve on the delivery of classrooms since we have noticed that majority of the schools have inadequate classroom blocks.

Smith stated that the innovation would enhance visual learning in schools.

“The teacher will be using the screen and the students will have access to notes the teacher is using through tablets. So, ones you have your tablet and internet connection, you could learn from wherever you are.”

Smith further said modular construction is not really about the methodology of construction, but the information technology in it, adding that there are other ways of achieving this, which might not be modular construction, but could be the traditional construction methodology.

He stated that government has put in place measures to ensure that it is sustainable by bringing in solar panels in addressing issue of power generation and disruption.

“Critical feature of the modular school buildings are basically classrooms blocks, corridors, toilets/conveniences, teachers’ rooms and staffs’ room and principals’ office.

“We are about finishing the block in Vetland Junior School and all the IT equipment is available and ready. Once the blocks are fixed, the contractor will incorporate the IT components.

The idea, he said, was new and government is building six of such projects, one per each educational districts. According to him, in a place like Badagry, the likely deploy construction that methodology of because the area close to the beach and the weather may not be able to take things like the container structure.

“We might change the method of construction but we still have to ensure that all the IT gadgets that we want to use in the school. We can decide to use another type of methodology like wall tiles and forms, which is not traditional or use things like concrete panels”, he said.

For him, the expectation from the scheme is that students in the state would get proper education with modern tools and technologies to learn adding that with the technology, the state is sure that peradventure, there is another pandemic, people can learn from home.

A source with the contractor handling the project, Equipment Hall, expressed optimism the modular school typed buildings will improve the infrastructure in Lagos learning environment and boost performance of students.

Article from – https://guardian.ng/

CUSTOMER NOTICE

Due to the COVID-19 pandemic, there has been and continues to be an extremely high demand for accommodation cabins such as office and canteen cabins.

At present, we currently don’t have the following stock available.
• 20ft used office/canteen cabins
• 24ft used office/canteen cabins

We still have a selection of used 32ft cabins in stock that we can prepare to customers layout and specifications. (PLEASE CONTACT US)

We also still have a large selection of varieties of used toilet block cabins, some with showers and drying rooms etc. (PLEASE CONTACT US)

We also can provide shipping containers in most sizes (new & used) with quick delivery. (PLEASE CONTACT US)

Please note, lead times for used 32ft office/canteen cabins and used toilet blocks etc is approx 6-8 weeks from date of order at present.

We are still manufacturing all types and sizes of NEW built to order cabins with a current lead time of approx 22 weeks from date of order. (PLEASE CONTACT US)

We appreciate your patience and hope to have all used cabin stock available in the the near future.

You have Successfully Subscribed!